Herunterladen Inhalt Inhalt Diese Seite drucken

General Information - Cuenod NC6 R101 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

General Information

Contents
Contents
General Information
Guarantee, safety............................. 23
Technical data .................................. 24
Installation
Assembly.......................................... 25
Fuel-oil connection ........................... 25
Electrical connection ........................ 25
Start Up
Preliminary checks ........................... 26
Settings, firing................................... 26
Control and safety unit
Program............................................ 27
Maintenance.................................... 28
Troubleshooting ............................. 29
Guarantee
Installation and start up must be carried
out in accordance with currently
accepted practices by a qualified
technician; current regulations as well as
the instructions that follow must be
complied with. The manufacturer will
decline all responsability in the event of
failure to comply fully and in every
respect with any of the relevant
requirements.
Refer also to:
- the certificate of guarantee attached to
the burner;
- the general terms of sales.
Safety
The burner is designed to be installed on
a generator connected to exhaust pipes
used for products of combustion in
serviceable condition.
It should be used in areas where an
adequate supply of fresh air is available
for correct combustion and where any
waste products can be properly
evacuated.
The size and design of the flue must be
appropriate to the fuel in accordance
with current regulations and standards.
Power supply (230 VAC % 50Hz
+10
- 15
to the control and safety unit as well as
to the cut-off devices used must include
an earthed neutral wire.
04/2006 - Art. Nr. 13 010 551E
Failing that, power supply to the burner
must include an isolating transformer
and the appropriate protection (30mA
circuit breaker and fuse).
The burner must be able to be isolated
from the system by means of a multipole
switch complying with the standards in
force.
Operating personnel should act with
extreme caution in all cases and more
especially avoid any direct contact with
areas that are not heat-insulated and
electrical circuits.
Water should not be splashed on to the
burner's electrical components.
In the event of flooding, fire, fuel leakage
or any other dangerous situation
(smells, suspicious noises, etc.), stop
the burner, cut off the main power supply
and the fuel supply and call in an
approved specialist.
The use of chlorinated solvents to clean
the burner is prohibited.
It is compulsory for all furnaces and
accessories, flues and connection
±1%
)
pieces to be maintained, cleaned and
swept at least once a year and prior to
burner start up. Consult the applicable
regulations in force.
A1
Control and safety unit
B3
Photosensitive cell
M1
Fan and pump motor
T1
Ignition transformer
pL
Air pressure take-off
Y
Graduated scale
Y1
Electrovalve
3
Screw for Y dimension setting
5
Four spiral fixing screws
7
Main board hanging device
8
Case
9
Electrical connection 7P.
14
Cover
15
Burner fixation flange
16
Unit reset button
102
Pump with electrovalve
103B Air flap control (manual)
105
Flexible hose
113
Air box
23

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Nc4 r101Nc6 h101Nc4 h101Nc9 h101

Inhaltsverzeichnis