Herunterladen Inhalt Inhalt Diese Seite drucken

Lifting Method And Weight Of Product; Installation Of Unit; Location Of Anchor Bolt - Mitsubishi Electric PUHY-YMF-B serie Installationshandbuch

Air-conditioners outdoor unit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

7. Lifting method and weight of product

When carrying the unit suspended, pass the ropes under the unit
and use the two suspension points each at the front and rear.
Always lift the unit with ropes attached at four points so that impact is
not applied to the unit.
Attach the ropes to the unit at an angle of 40° or less.
Use two ropes at least 8 m long.
B
A 40° or less
B Rope suspension part

8. Installation of unit

8.1. Location of anchor bolt

Individual installation
780±2
Example of collective installation
780±2
A (Service side)
8
A
Dangerous!
780±2
A
10
780±2
440
For collective installation, provide a 10 mm gap between units.
Weight of product:
PUHY-400
PUHY-500
432 kg
Caution:
Be very careful to carry product.
- Do not have only one person to carry product if it is more than 20 kg.
- PP bands are used to pack some products. Do not use them as a
mean for transportation because they are dangerous.
- Do not touch heat exchanger fins with your bare hands. Otherwise you
may get a cut in your hands.
- Tear plastic packaging bag and scrap it so that children cannot play
with it. Otherwise plastic packaging bag may suffocate children to death.
- When carrying in outdoor unit, be sure to support it at four points. Car-
rying in and lifting with 3-point support may make outdoor unit unsta-
ble, resulting in a fall of it.
780±2
780±2
472 kg
10
440
780±2
780±2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis