Herunterladen Inhalt Inhalt Diese Seite drucken

Configuration / Initial Operation - Storch ProCut compact Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Device description / Initial operation
Fig. 1:
Front view, transport and storage position (cutting bow
and bearing rail retracted)

Configuration / initial operation

The device is supplied in the transport and storage carton: Open the carton and lift it out of the carton at the transport
and carry handle (fig. 1, pos. 1) at the base plate (fig. 1, pos 2).
Transfer the device to where it is going to be used on the scaffolding and suspend it using the rear scaffold mount (no.
3, fig.2), positively fix the clamping bar at the rod and tighten the Tommy screw. The rubber buffers (no. 4, fig. 2) now
butt against the lower scaffold section of the backrest.
If the device is to be mounted on the stand
with freestanding support (no. 5, fig. 2) inclu-
ded in delivery, position the stand as shown
and make sure that the locking (no. 6, fig.2)
engages. Then insert the device with the
clamping screw (no. 7a) into the holding groo-
ve (no. 7, fig.2) as well as the reception for
the guide bolt (no. 6a, fig.2) on the guide bolt
(no. 6b, fig.2) and fix the clamping screw (no.
7a, fig.2). Make sure the device is mounted
securely and at the correct position.
3 Scaffold mount
4 Rubber buffer
5 Stand
6 Stand lock
6a Reception of stand guide bolt
6b Stand guide bolt
7 Stand holding groove
7a Stand clamping screw
Fig. 2:
Rear side and stand
2 Base plate
1 Transport and carry Handle
77
7
6b
6
5
3
7a
6a
4

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis