Herunterladen Inhalt Inhalt Diese Seite drucken

Installing Components; Releasing The Shipping Lock; Platform Installation; Draft Shield Installation (Carat Model) - OHAUS SPx303 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 77
EN-4

Installing Components

Releasing the Shipping Lock

On top of the balance, turn the pointer 90
degrees counter-clockwise to unlock.

Platform Installation

Balances with a rectangular platform are placed into the subplatform as shown and
rotated counter-clockwise until it locks. Round platforms are placed straight down
on subplatform.

Draft Shield Installation (Carat Model)

Position the keyed draft shield on top of the balance and rotate it until it faces forward.

Security Bracket

A security bracket is provided at the rear of the balance allowing the balance to be
secured by an optional cable and lock accessory.
Locked
Position
Pointer
Unlocked
Position
Releasing the Shipping lock.
Platform Installations.
Installing Draft Shield.
SPJ

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis