Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Unpacking; Installing Components; Selecting The Location - OHAUS EB3 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für EB3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 49
2.

INSTALLATION

2.1

Unpacking

Unpack and verify that the following components have been included:
Scale Unit
Weighing Platform (plastic base with stainless steel pan)
Instruction Manual
AC Adapter
Save the packaging material. This packaging ensures the ideal protection for the
storage or transport of the product.
2.2

Installing Components

Position the weighing platform pins into the through-holes on the top housing, then
set the platform securely into place. Secure the in-use cover with double-sided tape
as needed.
Before using the scale, remove the shipping protection screw located
underneath the scale. This screw ensures protection of the load cell during
transport, but will need to be removed for the scale to operate properly.
It is recommended that the protective screw be re-installed if transporting the
scale. Do not over-tighten the protective screw as it may damage the load
cell. To re-install, turn the scale on and place a 500g weight on the pan,
then slowly screw in the protection screw until the display shows a value
between 250g to 400g.
2.3

Selecting the Location

Operate the scale on a firm, level surface. Avoid locations with rapid temperature
changes, excessive air currents, vibrations, electromagnetic fields, heat or direct
sunlight.
2.4

Leveling the Scale

Adjust the leveling feet until the bubble is centered in the circle of the level indicator
(located on the front panel).
NOTE: Ensure that the scale is level each time its location is changed.
IMPORTANT:
EB SERIES EN-3

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Eb serieEb6Eb30Eb15Eb-series

Inhaltsverzeichnis