Herunterladen Inhalt Inhalt Diese Seite drucken

FAR KJ 45 Bedienungsanleitung Und Ersatzteile Seite 15

Vorschau ausblenden Andere Handbücher für KJ 45:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
KJ 45
KJ 45
f3
14
M12
1 ÷ 4
15
+
Tie rod max. stroke
Revolutions (M)
~ 8 mm
PLACING OF THE INSERT (fi g. f4-f5-f6)
Check that the threaded tie rod (A) and head (B) couple assembled on
the riveting tool is suitable to the size of the insert to be used.
Adjust the stroke as indicated (fi g. f2-f3).
Introduce the insert on the tie rod (A) and push slightly on it as indicated
in fi gure f4, so as to make it clamp automatically on the threaded tie
rod. Make sure that the insert head touches the head (B) checking
that the tie rod (A) comes out of 2mm from the insert.
In case of further adjustments of the tie rod (A) follow the instructions
of page 18.
It is possible to place the insert pushing the button (D) and keeping it
pushed up to the complete release of the tie rod (fi g. f5).
For a correct placing and right working of the machine, the inserts to
be used should be properly cleaned.
Note: According to the desired clamping, carry out other adjustments
of the riveting tool stroke, rotating the knob (M) (fi g. f2-f3-f6), if
necessary.
Insuffi cient deformation = the insert could rotate inside the housing
compromising its use and resistance.
Excessive deformation = possible damages of the insert and tie rod
(A) with eventual breaks of both components.
f4
~2mm
A
B
Revision - 04
9
10
11
12
13
Tie rod stroke
15
~ 0.4 mm
GB
8
7
6
5
Revolutions (M)
1
M
Date 10-2008
4
3
2
1
0
-
Tie rod min. stroke
Revolutions (M)
~ 2 mm
D
0
f5
f6
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis