Herunterladen Inhalt Inhalt Diese Seite drucken

Toshiba RAV-SP404AT-E Installationshandbuch Seite 17

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
Super Digital Inverter
How to open the valve
Open or close the valve.
Liquid side, gas side
Open the valve with a 4 mm hexagon wrench.
Valve handling precautions
Open the valve stem until it strikes the stopper.
It is unnecessary to apply further force.
Securely tighten the cap with a torque wrench.
Cap tightening torque
Ø6.4 mm
Valve size
Ø12.7 mm
Charge port
[Hexagonal wrench is required.]
14 to 18 N•m
(1.4 to 1.8 kgf•m)
33 to 42 N•m
(3.3 to 4.2 kgf•m)
14 to 18 N•m
(1.4 to 1.8 kgf•m)
Replenishing refrigerant
This model is a 20 m chargeless type that does not need to
have its refrigerant replenished for refrigerant pipes up to
20 m. When a refrigerant pipe longer than 20 m is used, add
the specified amount of refrigerant.
Refrigerant replenishing procedure
1. After vacuuming the refrigerant pipe, close the valves
and then charge the refrigerant while the air conditioner
is not working.
2. When the refrigerant cannot be charged to the specified
amount, charge the required amount of refrigerant from
the charge port of the valve on the gas side during
cooling.
Requirement for replenishing refrigerant
Replenish liquid refrigerant.
When gaseous refrigerant is replenished, the refrigerant
composition varies, which disables normal operation.
Adding additional refrigerant
SP40, 45
21~30 m: L
20 g × (L-20)
L: Pipe length
The refrigerant need not be reduced for a 20 meter (or
less) refrigerant pipe.
16
SP56
21~50 m: L
20 g × (L-20)
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis