Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Sequence - SMA SUNNY TRIPOWER 60 Installationsanleitung

Vorschau ausblenden Andere Handbücher für SUNNY TRIPOWER 60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 55
SMA Solar Technology AG

1.5 Installation Sequence

1. Pay special attention to the important safety
information at the beginning of this manual.
2. Mount the inverter according to Section 2.1, page 21,
Section 2.2, page 22, Section 2.3, page 23.
3. Open the inverter in accordance with Section 2.5,
page 24.
4. Install the AC supply in accordance with Section 2.6,
page 25.
5. Install Ethernet in accordance with Section 5.8,
page 52.
6. Install the PV module in accordance with Section 2.9,
page 27 using a PV array junction box.
7. Close the inverter in accordance with Section 2.5,
page 24.
8. Turn on AC.
9. Finalize commissioning by using the Local
Commissioning and Service Tool (LCS tool). The tool is
available from the download area at
www.SMA-Solar.com. The hardware requirements for
the LCS tool are:
– PC with Windows
– 1 GB HDD
– 2 GB RAM
The LCS tool must be installed on a local PC drive. The
PC must be connected to the system network of the
SMA Inverter Manager. For setup via the LCS tool,
refer to Section 3.3, page 31.
10. Switch on the PV system via the PV load-break switch.
11. Verify the installation by:
– Inverter display: LED "On" is permanently green.
– LCS tool: In the inverter view, the status is "On
grid".
12. The inverter is in operation now.
Installation Guide
TM
7 and later
1  Introduction
STP60-10-IA-xx-10
19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis