Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection - Jung Pumpen BAUFIX 100 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für BAUFIX 100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
ENGLISH
wherever you are working.
Make sure that there are no toxic gases in the working area.
Observe the health and safety at work regulations and make
sure that a first-aid kit is to hand.
In some cases, the pump and the pumping medium may be hot
and could cause burns.
For installations in areas subject to explosion hazards, special
regulations apply!
The sump BAUFIX 100 is a conventional effluent collecting
sump in conjunction with a separately ordered pump.
NOTICE! The Baufix must not be used in groundwater endan-
gered areas unless it is fitted with the "groundwater seal" ac-
cessory.
The screwed cover is smell-tight and level compensating. The
integrated and smell-tight floor drain can be opend on request.
Depending on the power requirement, various pump types can
be installed:
U3KS, U5KS, U6K ES/DS, US 62 ES/DS, US 73 ES/DS, US 102 DS,
US 103 ES/DS, US 73 Ex or US 103 Ex.
At installing the US 73 or 103 Ex pump an additional installation
kit (code-No. JP22410) for the pressure sensor is necessary.
NOTICE! In some countries it must not be used for pumping
sewage water from lavatories.
The allowed temperature of the pumped medium is 35 °C,
short time period 60°C.
The BAUFIX 100 PE-tank has two collateral inlet sockets DN
100 offset by 90 °, one discharge socket for Ø 40 mm PVC pipe
and a vent socket DN70.
Extent of delivery
Underground sump Baufix 100 pre-assembled with non-return
valve 1 1/4", cover frame with seal, lid with sealing plug usable as
a grommet. 2 bushings, hose connection, 2 hose clamps, PVC
pipe, profiled seal, siphon and elbow 90°, moisture-proof seal.

Electrical Connection

Please refer to the relevant instructions in the manual for the
pump.
MOUNTING
The pressure tube must be taken in a loop over the local back-
pressure level and secured with a reflux valve. (DIN EN 12056).
The reflux valve is already installed in the Baufix 100.
Accessory Groundwater seal
Fix the wall collar to the Baufix with the two strap retainers as
a sealant against groundwater.
Installing the tank
1. Affix the sealing profile with the clamping area on the neck
of the tank, taking care that the sealing cross-section (with
the sealing lips) is facing inwards. Brush the seal with a
mounting aid (such as technical Vaseline) and insert the
8
USE
cover frame into the neck of the tank, initially at an angle,
and then press the remainder in. The air should audibly es-
cape from the seal and the cover frame should be securely
in place. After assembling the frame, check that the seal is
correctly positioned on the tank. If necessary, repeat the
assembly of the frame if the seal is rolled up.
2. Saw open and deburr the inlet connections at the marked
place (cap). Connect the inlet pipe and ventilation pipe with
a KG pipe socket component (to be supplied by the user).
Connect up the pressure pipe with a DN32 PVC pipe socket
(to be supplied by the user).
3. After connecting the required pipes, align the Baufix 100
and fill in with earth. The entire cover must remain in the
Baufix to prevent dirt from getting in.
4. Fix the tank in place and concrete it in, so that it finishes
flush with the top edge. Notice! Do not concrete the cover
frame in place. The height of this cover frame must remain
freely adjustable by up to 100 mm and so be able to match
the level of any flooring planned (screed, tiles).
5. Before constructing the flooring, adjust the cover frame
to the intended height. The clamping action of the seal will
hold it in place.
6. After the screed has set, the enclosed square seal is bond-
ed to the integrated sealing strip. After the customer has
attached a further thin-bed waterproofing system, the area
can be tiled. Information on sealants and adhesives can
be found in the information sheet on "Composite sealing"
issued by the professional association of the German tile
industry within the German Construction Confederation
(ZDB).
Installating the pump
1. Cut the connecting parts to size, trim them if necessary and
bond them (illustration).
2. Bond the short, horizontal pipe section to the pipe socket
fitted with the swing-type check valve.
3. Screw the pipework together with the hose connection in
the elbow of the pump.
4. Insert the pump in the catch of the Baufix tank bottom,
connect the pipework to the non-return valve with the hose
connection and tighten the hose clamps. Notice! Ensure
the stable position of the pump as well as the free move-
ment of the float switch!
5. Pull the cable up to the T-piece through the vent pipe.
Enough cable has to be in the tank to allow the pump to be
pulled out of the tank for servicing. The T-piece can then be
sealed with the slotted plug.
Installation of floor drain
1. Take out the 2 screws of the cover plate and remove it.
2. Take the plug out of the cover connection piece with a
screwdriver.
3. Screw the siphon with the union nut, the packing and the
expanding ring on the connection piece.
4. The outlet of the siphon must not be positioned directly
above the pump.
5. Grease the screws, ensure the correct position of the pro-
filed seal and screw down the cover plate again.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis