Herunterladen Inhalt Inhalt Diese Seite drucken

Installing An External Ion Exchanger; Commissioning - clage Zip HydroTap G4 BC 100/75 Gebrauchs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für Zip HydroTap G4 BC 100/75:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Installation
Filter head article number: 84519
Filter cartridge (capacity at 10 °dH)
article number: 84500 = 4200 ltr
article number: 84501 = 8500 ltr
article number: 84502 = 20000 ltr
bend, turn it to the correct position and then tighten up the fastening nut again.
7. Connect the drain bend to a siphon connecting sleeve, using a 22 mm diameter
hose. If no siphon connecting sleeve is available, use the snap connecting sleeve.
a. Place the snap connecting sleeve on the side of the siphon facing the sink. Drill a
13 mm diameter hole in the drain pipe behind the snap connecting sleeve for a
drain connection. Use a suitable sealant to make a watertight seal between the
snap connecting sleeve and the drain pipe.

Installing an external ion exchanger

An external ion exchanger should be used from 10 °dH to reduce limescale deposits in
the hot water tank of the undersink unit and thus extend the maintenance intervals.
Note: If installing an external ion exchanger, follow the instructions supplied for
the filter head and filter cartridge.
Note: to flush through the ion exchanger before using it for the first time, connect
it directly to the angle valve and drain the water into a bucket or drain (depend-
ing on the size: 500 = 2-3 min, 1000 = 3-5 min, 2000 = 5-7 min).
1. Remove the bridge between the 'BYPASS OUT' and 'BYPASS IN' connections on the
undersink unit.
2. Connect the inlet on the filter head of the external filter to the 'BYPASS OUT'
connection using a flexible hose with ⅜ inch union nuts.
3. Connect the outlet on the filter head of the external filter to the 'BYPASS IN'
connection using a flexible hose with ⅜ inch union nuts.

Commissioning

1. Before using the unit for the first time, flush through the connecting pipes and hoses
thoroughly. To flush, detach the flexible hose from the water inlet of the undersink
unit and hold it over a drain or bucket. Turn on the water and allow it to run for
several minutes. Then reattach the hose to the water inlet of the undersink unit and
check the installation for leaks.
2. If no leaks are found, plug the plug into the socket and press the On switch on the
right-hand side of the undersink unit to activate the unit.
3. A prompt will appear on the display asking you to flush the filter. A container with a
capacity of about 10 litres will be needed to collect the water.
a. Open the service hatch on the front of the unit. Place the end of the plastic hose
in the collecting container and open the valve on the hose.
b. Touch 'Start' to start flushing.
c. Allow about 10 litres of water to drain out and then touch 'Stop' to stop flushing.
Close the valve on the hose and touch 'Next'.
4. Start temperature calibration, following the instructions on the display. During
this process the boiling point of water will be determined and the boiling water
temperature will be set accordingly. Calibration takes five to ten minutes. During
this time the red lever will flash and steam may discharge from the tap.
5. The unit will then be in normal operating mode. Wait for the red lever to show a
steady light, and then check the water flow and the temperature.
6. Register the appliance with the customer service department online at
www.clage.com.
21
CLAGE
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis