Herunterladen Inhalt Inhalt Diese Seite drucken

Returning To The Supplier; Installation And Start-Up; General; Installation - Homa C80 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für C80:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

After storage longer than one year the oil of motor and, if necessary the gear have to be changed.
This is also necessary if the product never had run (natural deterioration of mineral oil).
Before start-up, the filling levels (oil, cooling fluid etc.) of the individual products should be checked and
topped up if required. Please refer to the machine data sheet for specifications on filling. Damaged
coatings should be repaired immediately. Only a coating that is completely intact fulfills the criteria for
intended usage!
If these rules are observed, your product can be stored for a longer period. Please remember that elastomer parts
and coatings become brittle naturally. If the product is to be stored for longer than 6 months, we recommend
checking these parts and replacing them as necessary. Please consult the manufacturer.

4.4. Returning to the supplier

Products which are delivered to the plant must be clean and correctly packaged. In this context, clean means that
impurities have been removed and decontaminated if it has been used with materials which are hazardous to
health. The packaging must protect the product against damage. Please contact the manufacturer before
returning!

5. Installation and Start-Up

5.1 General

To avoid damage to the pump during installation and operation, the following points must be observed:
The installation work must be performed by qualified personnel in compliance with safety
regulations.
Before installation, the pump should be inspected for damage.
For level control, pay attention to the minimum water coverage.
Air pockets in the pump housing and piping are to be avoided (through appropriate venting devices
or a slight tilting of the pump).
Protect the pump from freezing.
The operating room must be designed for the particular machine. This also means that a lifting
device for assembly/disassembly can be installed, which can reach the installation area of the pump
safely.
The power lines of the pump must be positioned in such a way that a safe operation and easy
assembly/disassembly is provided.
The power lines in the operating room must be installed properly in order to prevent loose hanging
cables. Depending on the cable length and weight, a cable bracket must be installed every 2-3m.

5.2 Installation

Danger due to falling!
When installing the pump and accessories, you must be working directly on the edge of the pool!
Carelessness or wrong shoes can cause falls. Risk of death!
Take all precautions to prevent this.
The pressure line or the hose must be attached on the pressure socket of the pump and attach the pressure line.
When using a tube or pipe fitting with thread, the hose nozzle can be cut on the hose connection of the pump. In
order to ensure optimum flow rate, the pressure line should have a diameter of at least ¾ ". To prevent a return
flow of water when the pump is turned off, a flap trap can also be mounted in the discharge line. The discharge
line must be fitted free of tension.
When using a hose, make sure that it is not kinked. When using accessories, such as a quick coupling or similar,
make sure that it is sealed with Teflon tape, since a leak reduces the capacity of the pump.
Mount the pump with rope or chain on the handle, and lower it into the medium to be pumped. With a muddy
ground, place stones or other similar items under the pump to prevent subsidence.
Automatic float switch
If the water rises to a certain maximum level (switch on point), the float that rises to the top, automatically
switches the pump on. If by the pumping down, the water level dropped to a certain minimum level (switch off
point), the float switches the pump off.
30

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

C135

Inhaltsverzeichnis