To do this, remove the sealing caps on the
feed (23) and return connectors (24).

2.4 Installation

BHC 175
_ I f connected to the central heating system,
the heat carrier medium must be drained
first as described
before..
_ A Take the dimensions for drill holes from
the illustration of the BHC, depending on the
customer's existing water connections, and
mark out on a wall with sufficient load-bear-
ing capacity. Observe minimum distances!
_ Install wall distance pipe (12) with enclosed
raw plugs Ø8 mm (19) and screws 5 x 40
(13) depending on the construction of the
wall.
_ Push the spacers (15) into the wall distance
pipe and screw into position with the ad-
justing screw M4 x 10 (14) (do not tighten).
_ Position the radiator with the two upper
cross-pipes on the upper spacers and secure
in position on the spacers by means of the
clamp (16) (M5 x 30 screw, 17). Then fix at
the bottom in the same way as at the top.
_ Line up the radiator (push spacers into wall
bushes), tighten the adjusting screws in the
wall bushes at the top and put caps (18) on
the clamps.
_If connected to the central heating system,
connect it to the feed- (23) and return
connectors (24).
Connect a thermostatic valve to the flow
pipe connection.
Bleed the radiator via valve (25) while filling.
_ Plug in the mains plug (22).
BHC 175 L
_ I f connected to the central heating system,
the heat carrier medium must be drained
first as described
before..
_ A Determine the dimensions of drill-holes
according to the fixing bolts (26) or deter-
mine it from the dimensional drawing of the
BHC-L and mark it on a sufficient load-car-
rying wall, depending to the existing water-
connection-points. Beware the minimum
distances!
_ I nstall the mount-hook (20) depending to
the wall construction with suitable mount-
ing materials, e.g. with enclosed raw plugs
Ø8 mm (19) of and screws 5 x 40 (13).
_Hang the radiator on the retaining hooks
with the fixing bolts (26).
_Push caps (21) with "marking ridge upward"
onto the fixing wall (appliance is fixed).
_ If connected to the central heating system,
connect it to the feed- (23) and return
connectors (24).
Connect a thermostatic valve to the flow
pipe connection.
For a water connection from below or the
right side of the equipment accessories are
attached, fitting to the unit :
two 90°-elbow unions (31) and
– two extensions, one of 180 mm- (28)
and another of 130 mm-extension (29)
for the connection from below or
– a 50 mm extension (30) for the connec-
tion from the right side of the unit.
Bleed the radiator via valve (25) while filling.
_Plug in the mains plug (22).

Electrical connection

The appliance must be connected to
AC 230 V ~ 50/60 Hz only.
A socket must be installed at a distance of at
least 10 cm to the side of the heater for the
purpose of the connection.
BHC 175 L
31
28
29

2.5 Initial start-up

When it is started up for the first time, you
may notice a smell which is caused by any
manufacture-related residues on the radiator.

2.6 Hand-over

Explain the functions of the appliance to the
user. In particular, draw his or her attention to
the safety instructions. Hand over the operat-
ing and installation instructions.
26
20
21
13
31
31
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bhc 175l

Inhaltsverzeichnis