Herunterladen Inhalt Inhalt Diese Seite drucken

Corner Connection T-Configuration - Konig + Neurath INSIDE.25 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Corner connection
T-configuration 90°
(a) Remove protective caps
from the top and bottom.
(b) Position screens on the
pre-fitted linear connectors at
the bottom of the corner post.
(c) Take protective cover off
corner post. Position the top
linear connector in the corner
post slot and gaps between
the screens and bolt in place
(SW 3).
(d) Snap off the lugs on the
protective caps (predetermined
breaking point). Put the
protective caps on the top to
cover gaps between the
screens and the protective
covers on the corner posts
(not shown).
(a)
(b)
(c)
(d)
snap off!
19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis