Herunterladen Inhalt Inhalt Diese Seite drucken

Yamaha TT-R125E Handbuch Seite 152

Vorschau ausblenden Andere Handbücher für TT-R125E:
Inhaltsverzeichnis

Werbung

Ë After
connecting
switch coupler, engine stop
switch coupler, clutch switch
coupler and start switch cou-
pler, put a connector cover on
the couplers and push them in
at the rubber cover end.
◊ Pass the wire harness on the
outside of the main switch cou-
pler.
„ Do not allow the primary coil
lead to slacken where it is bare
of the protecting tube.
Â
F
E
Ê
D
TT-R125E
CABLE ROUTING DIAGRAM
Ù Fasten the CDI unit lead and
the
main
starting circuit cut-off relay lead
with a plastic locking tie at the
tape holding the main switch
lead, engine stop switch lead,
clutch switch lead, and start
switch lead together.
Á Position the starter cable, throt-
tle cable, CDI magneto lead,
wire harness and rear shock
absorber
hose (TT-R125LWE only) as
shown.
Ù
L
Í
K
J
I
H
G
F
Â
E
Œ
D
assembly
sub-tank
Ë
M
D
E
N
D
3
AB
A
O P
3
Û
B-B
1
2
A
3
Å
4
C
B
B
Ø
ˆ
3
A
˜
0
2 - 28
SPEC
Û Fasten the wire harness, throttle
cable, starter cable, CDI mag-
neto
lead
and
absorber
assembly
hose (TT-R125LWE only) at the
protecting tube for the CDI mag-
neto lead.
Fasten the rectifier/regulator
A A
lead as shown.
Do not allow the CDI magneto
A B
lead to slacken.
Position the plastic locking tie
A C
ends as shown.
C
7
4
0
Á
D-D
Î
5
ı
3
3
B
Ì
6
3
Ç
3
Ï
9
Ò
rear
shock
sub-tank
Q
3
AA
3
AC
N
E
C
7
Ó
È
3
3
Ô
8

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Tt-r125rTt-r125lweTt-r125lwr

Inhaltsverzeichnis