Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Before Switching On; Switch Position - Lenze 8200 motec Montageanleitung

3.0 - 7.5 kw bus -i/o
Vorschau ausblenden Andere Handbücher für 8200 motec:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7

Commissioning

Before switching on

7
Commissioning
Before switching on
Commissioning depends on the device combination (bus−I/O and fieldbus function
module). The commissioning procedure is described in the documentation on the fieldbus
system and the frequency inverter.

Switch position

ON
1
2
3
4
)
Note!
Make sure to set the DIP switch and C0034 to the same range, otherwise
ƒ
the analog input signal at X3/8 will be interpreted incorrectly by the basic
device.
If a setpoint potentiometer is supplied internally via X3/9, make sure to set
ƒ
the DIP switch to the voltage range 0 ... 5 V. Otherwise it will be impossible
to cover the entire speed range.
Signal at X3/8
0 ... 5V
0 ... 10 V (Lenze setting)
0 ... 20 mA
4 ... 20 mA
4 ... 20 mA (open−circuit monitored)
−10 ... +10 V
40
5
1
OFF
OFF
OFF
OFF
OFF
ON
l
ON
OFF
Switch position
2
3
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
ON
OFF
C0034
4
5
OFF
OFF
OFF
ON
ON
OFF
ON
OFF
ON
OFF
OFF
OFF
EDK82ZAFBC−201 DE/EN/FR 5.1
0
0
0
1
3
2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

E82zafbc201

Inhaltsverzeichnis