Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Maintenance Plan; After Each Workshift - Holzmann BS 115 Betriebsanleitung

Metallbandsäge
Vorschau ausblenden Andere Handbücher für BS 115:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

16

MAINTENANCE

Perform all maintenance machine settings with the
machine being disconnected from the power supply!
Serious injury due to unintentional or automatic
activation of the machine!
The machine does not require extensive maintenance. If malfunctions and defects occur, let it be
serviced by trained persons only:
Clean your machine regularly after every usage – it prolongs the machines lifespan and is a
pre-requisite for a safe working environment.
Repair jobs shall be performed by respectively trained professionals only!
Check regularly the condition of the security stickers. Replace them if required.
Check regularly the condition of the machine!
Store the machine in a closed, dry location.
Before first operation you should lubricate all connecting parts.

16.1 Maintenance plan

After each workshift:

 Raise the saw arm in the most upper position, secure it and close the hydraulic flow regulation
valve.
 Detension the saw band.
 Clean the machine entirely.
 Lubricate the gliding surface of the vice and the blade slightly with some machinery oil.
After 50 hours of operation
 Lubricate all connecting parts (if required, remove beforehand with a brush all swarfs and
dust)
HOLZMANN MASCHINEN GmbH
A T T E N T I O N
N O T I C E
www.holzmann-maschinen.at
MAINTENANCE
57
BS115 / BS128HDR

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bs 128hdr

Inhaltsverzeichnis