Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly / Commissioning; Assembling The Device - Wellsystem WELLSYSTEM_SPA Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly / commissioning

2
Assembly / commissioning
18/48
Two people are required for the assembly.
The device is delivered ready to be plugged in.
A transport bracket simplifies positioning the device on the massage device.
2.1

Assembling the device

The device is delivered in a cardboard box.
Open the box at the top and lift the device out of the box with the help of an-
other person.
NOTE:
If there is any dirt and oil residue on the massage device
frame then the adhesive surface of the hook-and-loop strips
will not adhere properly.
Clean the massage device frame with the cleaner that you
usually use – see the massage device operating instructions.
WARNING!
Damage to the massage device!
The rubber blanket can be damaged or the paint scratched
when placing the Wellsystem Spa on the device.
Place it on the massage device with care.
There are hook-and-loop strips on the bottom left and right which serve to
attach the device to the massage device.
Separate the hook-and-loop strips on both sides.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für Wellsystem WELLSYSTEM_SPA

Inhaltsverzeichnis