Herunterladen Inhalt Inhalt Diese Seite drucken

ophardt ingo-man plus Original Bedienungsanleitung Seite 35

Vorschau ausblenden Andere Handbücher für ingo-man plus:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7. Going into operation
After correct insertion of the batteries
an acoustic signal sounds.
Slip the dispenser from above onto the
mounting plate.
Close the face shield:
now the dispenser starts with the first gauging.
Noise level of the unit is below 70dB(A)
If the batteries have not been inserted with closed face shield,
the measuring procedure has to be carried out once again after
having put the dispenser on the mounting plate by shortly opening
and closing the runout diaphragm such as with the change and the
insertion of the pump.
IMP Touchless - Instruction manual
This procedure will be explained below in more detail.
ingo-man
plus
®
34

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis