Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Duct - Daikin FDXS25F2VEB Installationsanleitung

Vorschau ausblenden Andere Handbücher für FDXS25F2VEB:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 16

INSTALLING THE DUCT

Connect the duct supplied in the field.
Air inlet side
• Attach the duct and intake-side flange (field supply).
• Connect the flange to the main unit with accessory screws (in 16, 20 or 24 positions).
• Wrap the intake-side flange and duct connection area with aluminum tape or something similar to prevent air escaping.
Caution
When attaching a duct to the intake side, be sure also to attach an air filter inside the air passage on the intake side. (Use an air
filter whose dust collecting efficiency is at least 50% in a gravimetric technique.)
Outlet side
• Connect the duct according to the inside of the outlet-side flange.
• Wrap the outlet-side flange and the duct connection area with aluminum tape or something similar to prevent air escaping.
Caution
• Be sure to insulate the duct to prevent condensation from forming. (Material: glass wool or polyethylene foam, 25mm thick)
• Use electric insulation between the duct and the wall when using metal ducts to pass metal laths of the net or fence shape or
metal plating into wooden buildings.
9
Flange
(Field supply)
Connection screw
(accessory)
Aluminum tape
(Field supply)
Air inlet side
Insulation material
Main unit
Flange
(Field supply)
Aluminum tape
(Field supply)
Outlet side
English

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis