OPERATION
OPERATION
Before operating the device for the first time after correct installation, please
Before operating the device for the first time after correct installation, please
connect the hood to the mains (please observe the generally applicable safety
connect the hood to the mains (please observe the generally applicable safety
regulations).
regulations).
Control panel 1
Control panel 1
O
1
The motor is OFF.
1
The
motor
is OFF.
2
The motor is running at the lowest level.
The motor is running at the lowest level.
2
3
The motor is running at the medium level.
3
The motor is running at the medium level.
4
The motor is running at the highest level
4
The motor is running at the highest level
5
On/off switch for the integrated light.
On/off switch for the integrated light.
5
Control panel 2
Control panel 2
1
Timer button
I
Timer
button
2
Light button
Light button
2
3
LED display
3
LED display
4
Speed selection button
4
Speed selection button
5
On/Off button
On/Off
button
5
O
O
(2)
(3)
(4)
(2)
(3)
o
o
(5)
(4)
(5)
EN
33
33