Using the tables in Section 9.1 Selection aid for slots, select the
required diameter.
1
Take the product out of its package.
2
Measure the required diameter and select the corresponding slot
for the assembly legs.
3
Connect the assembly legs
(Figure
) using the click mechanism
A
4
Clean the area surrounding the ceiling cut-out.
5
Insert the product into the ceiling cut-out (Figure
three support wings
ceiling cut-out.
6
Press the three retaining spikes
to prevent subsequent slippage.
7
Check the product for firm seating.
8
Install the light (Figure
The downlight must be carefully installed between the legs of the
SpotClip-Kit.
9
Fasten the supply line for the light with a cable retainer
(Figure
) on the heat protection top.
G
; The SpotClip-Kit is installed.
Operating instructions • SpotClip-Kit • 11-2015
with the assembly plate
1
6
(Figure
) click into place above the
4
E
(Figure
5
) according to the operating instructions.
F
Product overview
2
(Figure
).
C
) until the
D
) into the plasterboard
E
3
7