C e n t r a l c o n n e c t i o n u n i t i n s t a l l a t i o n
1 Screw nuts M8 to the wall on upper threaded pins of the
wall fitting for the central connection unit,
push washer 8.4 x 24 on threaded pins.
The following steps 2 – 4 (Fig. below) only refer to the two
lower threaded pins of the wall fitting. These assist vertical
alignment of the central connection unit:
2 Screw nuts M8 to the wall on lower threaded pins of the wall
fitting for the central connection unit, push ball socket and
spherical discs towards the rear (Figure below).
3 Push central connection unit over the threaded pins.
4 Push spherical discs, ball sockets over the threaded pins
(reverse sequence of step 2, screw on nuts).
Wall
5 Screw washer 8.4 x 24 and nut M8 on upper threaded pins.
Follow this sequence!
Central connection
unit rear panel
Central connection
unit components
Transformer plug connection
2 light plug connections
Inner arch piece
2 plug connections
Light switch
Overhead shower
connection
Hot water
connection
Cold water
connection
Thermostat
Quattrostat switch-over
and shut-off valve
Connection
Rail, right body shower
Connection
Rail, left body shower
Connection
Hand shower angle
Shower tray support