Herunterladen Inhalt Inhalt Diese Seite drucken

Ispring RCCP Serie Bedienungsanleitung Seite 24

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
Issue
No Water
Output from RO
Faucet
Tank Not Filling
After Several
Hours
Leak at Tubing
Fittings
Leak from
Membrane Cap
and Housing
Low Water Flow
(Trickle) at RO
Faucet
High TDS in RO
Water
Cloudy Water
After Installation
Continuous
Drainage
Leak at Tank Valve
Connection
RO Water Tastes
Like Tap Water
24
Possible Cause
Cold water supply valve is
closed
Incorrect installation
Pump is not running,
preventing water ow
Tubing may be kinked,
blocking water ow
Pump is not running
Incorrect installation
Tank valve is closed
Tubing isn't fully inserted past
the O-ring, creating an
incomplete seal
O-ring inside the tting isn't
sealing
Misplaced or damaged O-ring
Tank hasn't lled
Tank valve is closed
System not providing 90%+ TDS
rejection (e.g., 500 ppm tap water
should be 50 ppm or lower)
Incorrect installation
RO membrane not installed
Tiny air bubbles in RO water after
installation or lter change
System takes 1-3 hours to ll
tank from empty, with a
continuous trickle during ll
Pump running constantly (24/7) See "Pump Runs 24/7" section
Faulty inlet solenoid valve
Insu cient Te on tape on tank
threads
Incorrect installation
RO membrane not installed
Possible Solution
Open the water supply valve, aligning it with the red
tubing
Verify all tubing connections
Ensure the pump is plugged into an outlet with
continuous power
Check all tubing and straighten any kinks
See "Pump Does Not Start" section
Verify all tubing connections
Ensure the tank valve aligns with the yellow tubing
Insert tubing a full 1/2 inch into the tting; additional
pressure may be needed
Replace with an extra elbow tting and wrap new
tting threads with Te on tape
Check that the O-ring is seated correctly before
screwing on the membrane cap; refer to "Installing
the RO Membrane" section
Allow approximately 2 hours for tank to ll
Ensure the tank valve aligns with the yellow tubing
Verify system performance.
Contact iSpring support to troubleshoot possible
bypassing
Verify all connections
Ensure the membrane is in the stage 4 housing
Air bubbles will dissipate with use; they are harmless
Normal operation
Contact support for valve replacement
Apply 8-10 wraps of Te on tape; contact support if
leak persists
Verify all system connections
Install membrane in its housing
Inhaltsverzeichnis
loading

Inhaltsverzeichnis