Installation Requirements
Before you begin the installation, make sure that you have the
following:
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ-45 Ethernet cables for connecting network devices.
Site Environment:
Make sure that the temperature of the installation site is maintained at 0°~50° and the
relative humidity is maintained at 10%~90%.
The installation site must be free from leaking, dripping water or heavy dew.
Keep the installation site dust-free.
The installation site must be well-ventilated.
Make sure that the switch is level and stable to avoid any hazardous conditions.
Make sure that the rack and the working platform are well-earthed.
Mounting the Switch
Desk Mounting
1. Attach four rubber pads to the bottom.
2. Place the switch on a desk.
5