And finally...
1
2
3
4
5
Note on connec-
IMPORTANT! When using the OPT/i CU Filter mounting / Duo option, connect
ting the coolant
the coolant filter option to the cooling unit as follows:
filter option
-
-
1
2
3
Fit the cover
Secure the cover with five TX25 screws
Tightening torque = 3 Nm
Fit the side panels
Secure the side panels with six TX25 screws
Tightening torque = 3 Nm
Put the cooling unit back into the welding system
(see the cooling unit Operating Instructions)
Always connect the coolant filter option to the side of the cooling unit with
the black plastic nut
Connect the coolant filter option to the red connection socket
Connect the coolant filter option to the red connection socket
Connect the hose supplied with the OPT/i CU Filter mounting / Duo to the
coolant filter
Connect the other end of the hose to the black connection socket
English
45