Herunterladen Diese Seite drucken

Bergstrom COMPACT 1.4 scania NTG Montageanweisungen Seite 19

24 v

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38
COMPACT 1.4
EN
9
Rout the cable inside the A-pillar cover along with
other cables.
10
Loosen the door seal next to the instrument
panel and insert the cable in the gap between the
A-pillar and instrument panel.
11
Remove cover to power central, to the right is the
Body Builder Power Central, highlighted with a
red frame. Remove the two screws and pull out
this unit.
Make sure cable comes in a front-to-rear-direction
to the reverse side.
19

Werbung

loading

Diese Anleitung auch für:

1003447368