SPARKGAS 3,6 - 6 - 11 P
ENGLISH
APPLICATION OF THE BURNER TO BOILER
The burner is equipped with a mounting flange which slips on the burner head.
When applying the burner to the boiler, it is necessary to
correctly position the flange so that the burner head
enters the furnace to the extent specified by the boiler
manufacture. When the burner has been correctly fa-
stened to the boiler, proceed with connecting in to the
gas pipeline.
The dimensions of the gas adduction pipeline should be
in function with it's length and with gas delivery according
to UNI regulations (see diagram BT 1387 reported on
the last page of the handbook).
It must be perfectly hermetic and adequately tested be-
fore the burner is general inspection.
It is indispensable to install a suitable pipe union in the
pipeline, in proximity to the burner, to allow for easy di-
sassembly of the burner and opening of the boiler door.
The DUNGS mod. MB... valve incorporates a filter and a
gas pressure stabilizer and, therefore, only a cut-off cock
and an anti-vibration joint have to be fitted onto the gas
adduction pipeline.
Only if the gas pressure were above the maximum value
allowed by regulations (400 mm. W.C.) would it be
necessary to install a pressure reducer on the gas
pipeline outside the heating plant. We advise installing a
bend directly onto the burner gas ramp before applying
the removable fitting. This layout makes it possible to
open the boiler door, if there is one, after the fitting itself
has been opened. The above is clearly illustrated in the
following drawing (see BT 8871/GB).
PORTATA / FLOW / DEBIT / DURCHSATZ / CAUDAL
m
3
/h
23