Herunterladen Diese Seite drucken

Waeco BMW5500G RPA Bedienungsanleitung Seite 121

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
BMW5500G RPA
✓ You are then prompted to remove the containers from the scale:
4. To check the zero point of the scales for oil and UV additive, open
the cover (23) on the left side and take the containers off the
catches:
– Container for fresh oil (20)
– Container for UV additive (21) and
– Drained oil receptacle (22)
When the scales are relieved, press ENTER to confirm. The prompt
to remove the containers from the scale will flash.
Once you have set the zero point, the selection menu for the scales
appears again.
5. Return the containers to the operating positions:
Reattach the containers for oil (20) and (22) and for the UV
additive (21) to the snap locks and close the cover (23).
6. Press STOP twice to access the standby menu.
EN
Remove the 3 Oil/UV
glasses from scales.
ENTER-OK STOP-EXIT
Service tasks
20
21
22
23
121

Werbung

loading