Herunterladen Diese Seite drucken

IKA RV 3 eco Betriebsanleitung Seite 23

Vorschau ausblenden Andere Handbücher für RV 3 eco:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
• Mount the washer
Drainage washer
NOTICE
Pay attention to the correct
position of the washer!
Hose system
Heating bath
Refer to the chapter entitled
CAUTION
"Commissioning" in the operating
instructions of heating bath.
Switch on the device
The unit is ready for service when
the mains plug has been plugged
in.
All manuals and user guides at all-guides.com
• Description of special condensers
(See products/accessories at www.ika.com)
- RV 10.3 Vertical-intensive condenser with manifold.
- RV 10.4 Dry ice condenser
- RV 10.5 Vertical-condenser with manifold and cut-off
- RV 10.6 Vertical-intensive condenser with manifold and
- Connect the water hoses (H
- Install the vacuum connections to the condenser,
- Always connect the vacuum hose (vac) to the condenser
- Use standard laboratory vacuum hoses with an inside
Commissioning
Use the power switch to switch on or off the device.
Adjust the speed by turning the speed adjusting knob.
This vertical-intensive condenser features a double
jacket design for particularly efficient condensation.
Also available with coating (RV 10.30)
Dry ice condenser is for distilling low-boiling solvents.
Cooling by dry ice, no cooling water is required.
Maximum condensation thanks to low temperatures.
Also available with coating (RV 10.40)
valve for reflux distillation.
Also available with coating (RV 10.50)
cut-off valve for reflux distillation
This vertical-intensive action condenser features a
double jacket design for particularly efficient reflux
distillation.
Also available with coating (RV 10.60)
according to the counter-flow principle.
condensate flask, vacuum controller with valve and
vacuum pump.
at the highest point to minimize solvent losses during
suctioning.
diameter of 8 mm and a wall thickness of 5 mm.
O) to the condenser
2
23

Werbung

loading