Installation procedure
1. Check the strength of the installation location.
This ceiling unit weighs approx. 19kg (41.9lbs).
The display weights approx. 33kg (72.8lbs) to
45kg (99.2lbs). Refer to the diagram on the right
and confirm that the four points for mounting the
ceiling unit and display are capable of bearing
this weight. If the installation location is not
strong enough to bear this weight, reinforce the
ceiling before the ceiling unit and display are
installed.
2. Prepare the ceiling unit.
• Remove the two M8 assembly screws
from the ceiling unit and separate the
upper and lower sections of the unit.
3. Install the ceiling unit
(upper section).
1. Before installing the upper section, pull
the wiring through the pipe. Use an
earthed mains extension lead (not
supplied).
2. Make holes in the ceiling using a
method appropriate for the ceiling
structure and for inserting M12mm
bolts. Install the upper section using a
hex socket bolt (M12 not supplied), flat
washer and spring washer.
N o t e
Note
• Reinforce the ceiling if it is not strong enough.
• Use bolts appropriate for the ceiling material (not supplied).
• Refer to the installing examples for wooden structure and concrete structure.
Installing to a wooden structure(example)
Mounting plate
(min.thickness 40mm [1
Ceiling board
4
Units
Ceiling installation holes
Nut
Flat washer
9
/
" ] )
Nail
16
Beam
Flat washer
Spring washer
M12 bolt
: mm (in.)
350 (13
300 (11
14 (
35
/
)
64
Front
Ceiling unit
(upper section)
M8 assembly screw
Ceiling unit
(lower section)
Signal cable
Earthed mains extension lead
(example)
(example)
Installing to a concrete structure(example)
25
/
)
32
26
/
)
32
Flat washer
(not supplied)
Spring washer
(not supplied)
M12 bolt
(not supplied)
Concrete
Anchor nut or
curled plug(M12)
Flat washer
Spring washer
M12 bolt