11. Introduction of the bottled gas regulation
Regulation (EU) no. 517/2014 of 16/04/14 on fluorinated greenhouse gases and the repealing of
regulation (EC) no 842/2006
Leak checks
Operators of e uipment that contains fluorinated greenhouses gases in uantities of 5 tons of CO
or more that is not contained in foam, must ensure the equipment is checked for leaks.
E uipment that contains fluorinated greenhouse gases in uantities of 5 tons of CO
less than 50 tons of CO
Image of the equivalent CO
From 2 to 30 kg load = from 5 to 50 tons
Annual inspection obligation concerning Gaz R 410a, 2.39kg equivalent to 5 tons of CO
Training and certification
The operator of the relevant application shall ensure that the relevant personnel have obtained
the necessary certification, which implies appropriate knowledge of the applicable regulations and
standards as well as the necessary competence in emission prevention and recovery of fluorinated
greenhouse gases and the safe handling of the relevant type and size of equipment.
Record keeping
1. Operators of equipment which is required to be checked for leaks, must establish and maintain
records for each part of such equipment specifying the following information:
The uantity and type of the fluorinated greenhouse gases that are installed.
uantities of fluorinated greenhouse gases added during installation, maintenance or servicing
or due to leakage.
hether the uantities of installed fluorinated greenhouse gases have been recycled or re-
claimed, including the name and address of the recycling or reclamation plant, and where ap-
propriate any certificate number.
The uantity of the fluorinated greenhouse gases that are recovered
The identity of the company which installed, serviced, maintained and where applicable re-
paired or decommissioned the e uipment, including, where applicable, the number of its certifi-
cate.
The dates and results of the checks carried out.
If the e uipment was decommissioned, the measures taken to recover and dispose of the fluori-
nated greenhouse gases.
2. The operator must store the information for at least five years. Subcontractors who perform ac-
tivities for operators must keep copies of the information for at least five years.
80
must be a checked a minimum of every 12 months.
2
(CO
2
CO
load in kg and tons
2
load in kg and tons).
2
MV-1085-1086-1093-11-2017 . © All rights reserved Swim & Fun Scandinavia ApS
or more, but
2
Frequency of testing
Every year
UK
2
2

Werbung

loading

Diese Anleitung auch für:

10861093