6.2 Commissioning
WARNING!
Risk of electric shock!
This battery storage may only be put into operation
by a qualified electrician in accordance with
the applicable regulations!
For unqualified persons there is a risk of
life-threatening electric shocks!
The following instructions re addressed
to the installer.
Verification of the installation
Before commissioning the battery storage unit, make sure
that the following requirements are met:
• The battery storage is firmly attached to the wall
with the bracket and aligned horizontally.
• All cables between the battery and the inverter,
as well as the entire system, are firmly connected
and the polarity and voltage are correct.
Commissioning procedure
For commissioning, also observe the instructions
in the user manual of your inverter
and proceed as follows to switch on the battery storage:
• Switch on the existing circuit breakers.
• Switch on the battery storage by pushing the
battery DC circuit breaker marked "SWITCH" upwards.
  N oteontheoperationstartphase
In the first few days after the start of operation
the battery storage system runs through a training
programme of about one week.
Deviations from the expected operating state
are normal and harmless during this time.
Connecting the Device
45