Herunterladen Inhalt Inhalt Diese Seite drucken

Software Installation; Initial Operation; Inserting The Batteries - VOLTCRAFT SL-451 Bedienungsanleitung

Schallpegelmessgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7. SOfTWARE INSTALLATION

• Insert the CD into the CD-ROM of your computer.
• The installation will start automatically. If not, please go to your CD-ROM directory, and open the
installation file "autorun.exe".
• Select your desired language from German, English and French.
• Follow the instructions on the dialog box, select the destination for the installation and complete the
installation.
• For further information, please refer to the operating instructions on the CD provided.
• The enclosed software is the Voltsoft standard edition. The professional version (Voltsoft Data
Logger, No. 10 13 33) is an optional item which you can purchase separately. If you purchase the
professional version, you will get the license key. Follow the steps in the Voltsoft user manual, to
register and upgrade your software to the professional version.
• Voltsoft software updates to the latest version of the Voltsoft program are available when the pro-
gram is running and the Internet is connected; or check for the latest Voltsoft update via
"http://www.conrad.com"

8. INITIAL OPERATION

Inserting the batteries

Before the initial operation of this meter, you must first install a new 9 V block battery. Battery
installation is described in the "Maintenance and cleaning" section.
Power unit operation
For long-term measuring operations, you have to use the enclosed power adaptor. Plug the power
adaptor into the DC socket on the side and connect it with a suitable mains outlet.
32

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis