VI. Installation and adjustment
1. Installation:
Warning: before using the mobile air
conditioning, keep it upright for at least two
hours.
The air conditioning can be easily moved in the
room. In the moving process, ensure that the air
conditioning is in the upright position and the
air conditioning should be placed on a flat
surface. Do not install and use the air
conditioning in the bathroom or other humid
environments.
1.1 Install the heat pipe assembly (as shown in
Fig.1)
1) take out the outer connector assembly and
the exhaust pipe assembly, and remove the
plastic bags;
2) insert the heat pipe assembly (the end of the
exhaust joint) into the back panel vent slot
(push to the left) and complete the assembly
(as shown in figure 1).
PUSH
Figure 1
-56-