Herunterladen Diese Seite drucken

Baxi LUNA DUO-TEC MP 1.90 Gebrauchsanleitung Für Den Benutzer Und Installateur Seite 31

Kondensations-wandgasheizkessel

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

TERMINAL BLOCK M3
not used.
storage boiler pump connection.
system heating pump connection (external downline from hydraulic separator).
Use the relative cable grommets at the bottom of the boiler to thread the cables through to the terminal blocks.
11.1 CONNECTING THE ROOM THERMOSTAT
To connect the Room Thermostat to the boiler, proceed as
described below:
Access the terminal block M1
Remove the jumper from the ends of contacts 1-2 and
Switch on the boiler and make sure the Room Thermostat
works correctly.
11.2 ACCESSORIES NOT INCLUDED IN THE SUPPLY
11.2.1 REMOTE CONTROL
To operate the boiler with the Remote Control mounted on the wall, purchase accessory A supplied with the base A1. Also see
the mounting and operation instructions supplied with the kit A. Proceed as follows:
Switch off the boiler.
Pass the three wires from the boiler terminal block M2 through the hole in the base A1 to apply to the wall.
Connect wires 1-2-3 of the boiler terminal block M2 to terminals (1)-(2)-(3) of the base terminal block A1 respectively.
Fix the base A1 to the wall using the expansion grips and screws supplied with the accessory.
Apply the Control Panel A
Power the boiler making sure that the Remote Control lights up.
A
A - A1
A1
Min. 200 mm
1500mm
A1
A
B
31
B
A
A1
B1
B1
7115213.01 (4-10/14)

Werbung

loading

Diese Anleitung auch für:

Luna duo-tec mp 1.110