Herunterladen Diese Seite drucken

probst STONEMAGNET SM-600 Betriebsanleitung Seite 91

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation of the lifting device is complete after 3-4 successful test runs with a
load. A type test covers the inspections required in Europe before initial use in
accordance with DIN EN 13155.
Changing the suction plate
1.
Place the lifting device on a clean, even area.
2.
Turn the lifting device off.
3.
Remove the vacuum hose.
4. Loosen the ring nuts.
5.
Lift the lifting device while keeping the suction plate steady.
6. Attach the new suction plate onto the lifting device (see section 5.3).
7.
Store unused suction plate in a suitable location (see section 7).
Power supply
The lifting device is powered by an integrated battery. An external power supply during operation is not
required.
27/43
Charging the battery takes around one work day.
The battery must be charged after each use so that the lifting device remains
ready for use at all times.
The battery can be charged constantly.
A replacement battery can be stored, as well (see section 9.2 for information on
changing the battery).

Werbung

loading