Herunterladen Diese Seite drucken

BWT Avanti HWS Einbau- Und Bedienungsanleitung Seite 13

Werbung

Installation
Installation
Installation
Installation
Installation
Fit domestic water station in flow direction into the
horizontal cold water pipe (see installation dia-
gram).
Fit pressure gauge, providing a seal.
Route the flushing water connection with hose to
the sewage system or provide a collecting basin
(approx. 10 litres).
Please note: According to DIN 1988 the flushing
water hose must be fastened at a distance of at
least 20 mm from the highest possible waste-
water level (free discharge).
Startup
Startup
Startup
Startup
Startup
Check the domestic water station and the flushing
water line for correct and proper installation.
The shut-off valves must not be opened yet.
Check the transparent cylinder (3)
correct fit and close rotary button for backwas-
hing element (5 5 5 5 5 ) clockwise.
Slowly open the shut-off valves before and after
the domestic water station and deaerate the piping
at the next tapping point after the domestic water
station.
Open the rotary button (5 5 5 5 5 ) anticlockwise and after
removing approx. 5 litres close it again. Check
the domestic water station for leaks.
The pressure reducing valve is factory set to a
back pressure of 4 bar. In order to change the
back pressure, loosen the locking screw (9 9 9 9 9 ) and
turn the rotary
button for pressure reducing valve (10
The back pressure can be changed by turning
the rotary button (10
10
10) (control range 1.5 - 6 bar).
10
10
Turning in a clockwise direction = higher back
pressure.
Turning in anticlockwise direction = lower back
pressure.
The indicator for the back pressure setpoint (8 8 8 8 8 ) is
a standard value. The pressure gauge (6 6 6 6 6 ) shows
the pressure precisely. During setting, a draw-off
tap after the pressure reducing valve must be
opened briefly several times and closed again.
When water is drawn off, the back pressure drops
temporarily.
The back pressure must not exceed 80% of the
initial pressure of the hot water safety valve
(DIN 1988).
Operation
Operation
Operation
Operation
Operation
Change the back pressure, see Startup.
Backwashing must be carried out once per month
in order to prevent the settling of impurities on the
filter fabric (in case of severe pollution possibly
more often).
Before backwashing, provide a collecting basin, if
the flushing water connection is not connected to
the sewage system.
Backwashing
Backwashing
Backwashing
Backwashing
Backwashing
Turn rotary button (5 5 5 5 5 ) anticlockwise, until water
flows audibly and then close again. Check the
filter for leaks.
The plastic parts may be cleaned only with a soft,
(3)
(3)
(3)
(3) to ensure
clamp cloth. Solvents or detergents must not be
used.
Replacing the valve insert
Replacing the valve insert
Replacing the valve insert
Replacing the valve insert
Replacing the valve insert
Close shut-off valves before and after the
domestic water station and relieve the pressure
at both sides. Loosen the locking screw (9 9 9 9 9 ) and
turn the rotary button (10
direction up to the stop. Screw off the spring hood
(7 7 7 7 7 ) with a ring spanner. Remove the valve insert
(11
11
11
11) and the sliding ring (12
11
Coat the O-rings of the new valve insert with
silicone grease and insert the valve insert in the
body, at the same time ensuring the correct
10
10).
10
installation of the O-rings. Insert the sliding ring
10
and screw on the locking screw. Adjust the pres-
sure reducing valve, as described under Startup.
10
10
10) in an anticlockwise
10
12).
12
12
12
13
13
13
13
13
GB GB
GB GB
GB

Werbung

loading