Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Remove Cover - Geze Ts 5000 R-Ism Bg Montageanleitung

Gleitschiene für bandgegenseite mit integrierter schließfolgeregelung, rauchschalter und elektrischer feststellung
Vorschau ausblenden Andere Handbücher für TS 5000 R-ISM BG:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

TS 5000 R-ISM BG
7

Initial operation

CAUTION!
To avoid unnecessary contamination the installation of the smoke switch should be undertaken only just
before the initial operation.
In case of early installation there is a risk that the smoke switch is contaminated by construction dust. This
shortens the life of the smoke switch considerably!
7. 1

Remove cover

Remove inspection caps between cover panels (1.) / Remove protective cap (2.).
X
Remove middle cover panel and moving-leaf cover panel (3.) / Remove the foam lining (4.).
X
7.2
Installation and connection of the smoke switch
Clip on smoke switch.
X
Plug in 24 V cable of the of electrical hold-open device (1) and the power pack (2).
X
Stow away the excess cable into the power pack housing.
X
For additional connections, see the separate document "Instructions for Installation, Commissioning, Operation
X
and Maintenance of the GEZE Hold-Open Device FA GC".
Initial operation
Fig.: 7.1.1
Fig.: 7.2.1
Fig.: 7.2.2
GB 10
Inhaltsverzeichnis
loading

Inhaltsverzeichnis