STIEBEL ELTRON ZLA 60-T60 Bedienung Und Installation Seite 31

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INsTALLATIoN
Commissioning
Timed
L
N
X1
2
1
S
L
C
M
N
G1
X1
Terminal module, fan
G1
LA 60 Ve-U & ZLA 60-T60 /
LA 60 Ve-A & ZLA 60-T60
s1
switch
Humidity-controlled with base load
L
N
X1
2
1
S
C
M
N
G1
X1
Terminal module, fan
G1
LA 60 Ve-U & ZLA 60-H /
X1
LA 60 Ve-A & ZLA 60-H /
G1
s1
switch
S1
LA 60 Trend | LA 60 Plus
N
100 %
S1
0 %
L
N
100 %
S1
50 %
Klemmbaustein Lüfter
LA 60 Plus
Schalter
Timed with base load
L
N
X1
2
1
S
L
C
M
N
G1
X1
Terminal module, fan
G1
LA 60 Ve-U & ZLA 60-T /
LA 60 Ve-A & ZLA 60-T
s1
switch
11. Commissioning
For windowless bathrooms and toilets where little moisture
occurs in normal use, the extract air flow rate, according to
dIN 18017-3, can be reduced to 0 at times when air demand is
low. In this case, the appliance must have a run-on time capa-
ble of extracting at least 15 m³ of air from the room.
11.1 Checks before commissioning
Material losses
!
Never operate the appliance without filters.
f Check whether the filter is installed.
11.2 Initial start-up
Material losses
!
If there are excessively large amounts of dust outside
or inside, the filter and ventilation components may
become clogged. dust is created by cutting tiles or
working with plasterboard, for example.
f do not operate the appliance during building
work.
Appliance handover
f explain the functions of the appliance to the user. show
the user how to operate the appliance.
f Make users aware of potential dangers.
f Make users aware of critical environmental factors and
requirements concerning the installation site.
N
100 %
S1
50 %
| 31