Herunterladen Inhalt Inhalt Diese Seite drucken

Overview; Installation; Overhead Rigging - EuroLite LED-Leiste 24/6 TCL Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

OVERVIEW

1. Safety Rope
2. Power Supply
3. Fuse
4. Mounting bracket
5. MODE/SETUP keys
6. LC display
7. UP/DOWN keys
8. Microphone
9. DMX IN
10. DMX OUT

INSTALLATION

Overhead rigging

The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The device should be installed outside areas where persons may walk by or be seated.
17/43
00046604.DOC, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

51913859

Inhaltsverzeichnis