Herunterladen Inhalt Inhalt Diese Seite drucken

Transporting The Cooling Unit - Pfannenberg DTS 6401-Serie Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
ENG
4.2.1

Transporting the cooling unit

Prerequisites
The cooling unit is accommodated in the factory packaging.
Required tools and materials
Lashing straps, if necessary loading crane
Procedure
1.
Secure the unit properly for transport using lashing straps. Always transport in the operating position.
2.
Only lift the unit by its housing.
3.
Always raise the cooling unit slowly and evenly and park it securely.
The cooling unit was properly transported and loaded.
NOTE
The cooling unit can also be lifted by means of M8 jack rings.
Observe the information in chapter "Crane transport", Page 33 for crane transport.
Operating Manual | Attachment and Installation Cooling Units | Multi Controller (MC) – 400 / 460 V, 3~ | 086100124
32/76

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Dti 6401-serieDti 6501-serieDts 6501-serie

Inhaltsverzeichnis