Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning And Setting Up - Jung FRWM200SW Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Note that only one side of the mag-
netic carrier is highly magnetic.
(6) To ensure a safe hold of the device, tight-
en the screw deep into the dowel so that
it closes flush with the magnetic carrier.
Also in a drilling installation, you can
create an adhesive compound us-
ing additional adhesive film, accord-
ing to vfdb 14/01 (Q) (see chapter
„Adhesive mounting according to EN
14604:2005/AC:2008 and vfdb 14/01
(Q)" on page 57).
(7) Take the device into operation and set
it up.
f Observe chapter 6 „Initial commissioning
and setting up" on page 59.
(8) Put the device on the magnetic carrier.
5 Magnetic carrier is attached and the
device is placed.
EN
Operating Manual: FRWM200 – Smoke Alarm Device with Radio Link
6
Initial commissioning
and setting up
Always consider the following when putting
into operation and setting up the smoke alarm
device:
f Commission devices in a radio group
one after another in their final installation
location.
f To prevent overlaying radio signals, keep
a minimum distance of 2 to 3 m between
the devices.
f Establish a radio group of at least 2 and
a maximum of 15 smoke alarm devices
connected together.
f Connect a maximum of 15 radio groups
together.
f After putting the device into operati-
on, the splint pin is used as a tool for
operating the radio button, and must be
kept readily available in the vicinity of
the device.
Shared radio group and subgroup
Shared radio group and subgroup
For special applications, it may be useful to set
up a shared radio group (e.g., in the corridor of
an apartment building). A central radio group
(corridor), which is associated with one or
more other radio groups (flats), takes over the
function of the shared radio group. The other
59

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Frwm2005375149

Inhaltsverzeichnis