ATTENTION
Pipe connection with Geberit electrofusion
EN
coupling
Leaking connection caused by faulty welding
▶
Prepare and execute the welding joint in
accordance with manufacturer specifications.
▶
The pipe must be kept in a tension-free
position during the welding procedure and the
cooling-down phase.
▶
Draughts through the pipe interior must be
avoided.
▶
Make sure that the welding joints are clean
and dry.
Contact
Technical information can be requested from the
relevant Geberit sales company or accessed at
www.geberit.com.