Herunterladen Inhalt Inhalt Diese Seite drucken

Disposal; Installation; Lifting, Transport & Unloading; Positioning Of The Equipment - voestalpine Bohler Welding TERRA NX 320 MSE Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 62

INSTALLATION

1.9 Disposal

EN
»
2. INSTALLATION
2.1 Lifting, transport & unloading

2.2 Positioning of the equipment

Keep to the following rules:

2.3 Connection

The equipment is provided with a power supply cable for connection to the mains.
The system can be powered by:
• three-phase 400V
Operation of the equipment is guaranteed for voltage tolerances up to ±15% with respect to the rated value.
earth contact.
sets is recommended.
36

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis