Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Connecting The Supply Line - Seto ALDEBARAN 360 GRAD FLEX-C 2.0 Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für ALDEBARAN 360 GRAD FLEX-C 2.0:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The luminaire is only to be connected to an alternating current – with the voltage according to the rating plate – to a properly
installed safety socket. Please note that your system corresponds to the relevant VDE guidelines.
If you have any questions about this, please contact your energy supplier or your electrician. Of course we are at your disposal
if you have any questions.
ATTENTION!
In the case of versions of the luminaire with other plug-in systems (not Schuko®), the voltage according to the rating
plate must be observed.
To connect the supply line to the luminaire, insert the cable socket of the supply line into the cable plug of the luminaire and
turn the threaded ring of the cable socket "hand-tight" (approx. 50 cNm) clockwise.
To disconnect the cable, unscrew the threaded ring of the cable socket anti-clockwise and pull the connectors apart.
DANGER! Electric current!
Before connecting or disconnecting the supply line,
make sure that the luminaire is disconnected from the
mains supply.
ATTENTION!
The luminaire may only be operated with the original
cable. Cables for replacement or repair can only
be obtained from the manufacturer or its service
representative.
WARNUNG!
• Lay the cables in such a way that there are no tripping hazards and they are protected from mechanical damage
such as tearing off or being run over.
• If necessary, secure the cables with tape or cable ties.
• Make sure the luminaire is securely set up and fastened before use.
• Also observe the applicable regulations on occupational safety!
• The protective film on the front pane may need to be removed before using the luminaire.
Electric connection
Connect the mains plug of the connecting cable to your mains connection socket.
The LED spotlight is ready for operation once it has been connected to the mains power supply.

Initial operation

Connecting the supply line

Cable plug
(Luminaire)
Cable socket
(Supply line)
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis