Herunterladen Inhalt Inhalt Diese Seite drucken

Genmitsu Jinsoku LC-50 Plus Benutzerhandbuch Seite 19

Lasergravier-/ und schneidmaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly Guide
STEP 10: Adjust the Tension of Timing Belt
1. Take M3*14mm screws as shown in the diagram, align the screw with the screwed hole at the right end of
the rear module, then screw in and tighten it. (The timing belt tension has been initially adjusted at the factory,
if you need to adjust, the side M5 screws can be adjusted by loosening.)
2. Take M3*14mm screws as shown, align
M3*14mm Screw
the screws with the screwed holes at the
left end of rear module, then screw the
screws in, stop when the timing belt
tightness meets the requirements, and
tighten the M5 screws on the left side.
(You can refer to the right side timing belt
tightness)
M5 Screw
M5 Screw
3. Take M3*22mm screw as shown in the
M5 Screw
M3*22mm Screw
diagram, align the screw with the screwed
hole at the right end of the X-axis module,
then screw in and tighten it. (The timing
belt tension has been initially adjusted at
the factory, if you need to adjust, the side
M5 screws can be adjusted by loosening)
17

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Genmitsu Jinsoku LC-50 Plus

Inhaltsverzeichnis