Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Initial Start-Up; Switch-On - Knauer Azura CT 2.1 Benutzerhandbuch

Säulenthermostat
Vorschau ausblenden Andere Handbücher für Azura CT 2.1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Legend
Precolumn temper-
1
ing
Separating column
2

Operation

Prerequisite
Procedure
KNAUER
17
Operation
Note: Only one separating column can be connected to the
precolum tempering.
1
Fig. 5
Connection to precolumn tempering
In this chapter, you find information which is relevant for oper-
ating the thermostat.

Initial Start-Up

Use this checklist to determine whether the detector is ready for
the initial start-up:
Devices is positioned in the correct location.
The power plug has been pulled.
If the device is part of an HPLC system, you should also note the
following:
The network connection to the router is established.
The chromatography software has been installed by KNAUER
or a company authorized by KNAUER.

Switch-On

The installation has been completed.
WARNING! Beware of explosion! High concentra-
tion of organic solvent vapor may lead to explo-
sion. 
Can cause serious injury. Do not allow flammable
chemicals to leak.
CAUTION! 
Possible damage to the device caused by con-
densed water!
Allow device to acclimate for 3 h, before it is con-
nected to power supply and taken into operation.
1. Connect the power supply of the device to the mains.
2. Switch the power supply on.
3. Enter the temperature via chromatography software or the
operating panel.
CT 2.1 User Manual, V6810, Version 1.1
2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis