Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Undersink Unit - clage Zip HydroTap G5 BCS 20 Gebrauchs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für Zip HydroTap G5 BCS 20:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Zip HydroTap® G5 BCS20
4. Installation
EN
Additional
optional
air inlet
C
300
B
Flexible hose
Hydrotap
Appliance

Installing the undersink unit

Note: An air gap of at least 50 mm at the left and right of the unit must be
provided for adequate ventilation. If the unit is to be operated inside a cupboard,
the supplied silicone buffers should be affixed to the inside edge of the cupboard
doors and the ventilation grills should be installed.
Note: Additional ventilation must be ensured if the temperature in the base unit
exceeds 35 °C.
1. Position the undersink unit as close to the tap as possible.
2. Saw a 300 × 40 mm cut-out in the floor of the cupboard at the planned installation
position.
3. Fix the mounting plate C with the supplied screws to fit over the cut-out and then
screw the undersink unit onto the mounting plate.
4. Fix the 4 mm silicone spacers B to the cabinet door from the inside so that it is held
open a gap.
40
5. Connect the water inlet to the angle valve (not supplied). Use the flexible hose
supplied and the adapter if necessary to make this connection.
6. Connect the tap hoses to the undersink unit. Ensure there is a constant fall from the
tap down to the undersink unit. Trim the hoses to avoid loops and kinks. The hoses
must not be lengthened.
7. Connect the signal leads of the tap and the undersink unit. Attach the plug
connection at a location away from any water splashes.
Adapter
Angle
valve
28

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis