Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Undersink Unit - clage Zip HydroTap G5 BCS 60 Gebrauchs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für Zip HydroTap G5 BCS 60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Zip HydroTap® G5 BCS 60
4. Installation
EN
1
3
possible air inlet
*
positions
* same dimensions like cut out A
** same dimensions like cut out B

Installing the undersink unit

Note: An air gap of at least 50 mm at the left of the unit must be provided for
adequate ventilation. If the unit is to be operated inside a cupboard, the supplied
silicone buffers should be affixed to the inside edge of the cupboard doors and
the ventilation grills should be installed.
Optional the ventilation grills should be installed, if the temperature rises above
35 °C in the cupboard.
The vent tray kit KXB is an accessory element for the BCS60 and must be used during
installation for sufficient ventilation. The warm exhaust air is routed through the KXB
and will be blown out directly in front of the cupboard.
The BCS can be placed on the KXB and can be mounted together with it in the cup-
board.
1. Before installing the vent tray kit, make sure an air inlet into the cupboard is fitted.
The provided ventilation grilles can be used if the air inlets are sized as cut outs 'A'
or 'B'.
2. For marking purposes, place the assembled vent tray kit in a suitable position on
the cupboard floor. Verify that there is sufficient clearance around the BCS (min.
50 mm) and all hose and tube connections will be reached.
3. Mark the position of the outlet duct (see picture position '1') on the front of the
cupboard floor.
4. Adjust the depth of the main box section '2' by sliding the box back to suit the
2
depth of the BCS (max. 50 mm). Check that both sides of the main box are parallel
with the outlet duct section by using the alignment marks '3' on both sides of the
main box.
5. Mark the position of the main box on the cupboard floor and remove the complete
vent tray kit.
6. Cut an outlet vent into the front of the cupboard floor between the marks made
in step 3. The cut out should be 450 mm wide. The depth should reach as close as
possible to the kickboard (max. 43 mm).
7. Place the main box according to your marks from step 5 and secure it with the four
large screws supplied.
max. 50
8. Refit the outlet duct to the front of the main box and secure it with the two small
screws supplied.
9. Place the BCS60 on the KXB and install the side mounted air duct as described.
B
28
A
285.00
B
314.00
326.00
A

Werbung

Inhaltsverzeichnis
loading