CLEANING AND MAINTENANCE

Cleaning can be carried out by the user.
Maintenance operations must be performed by an authorised technical assistance centre.
Before carrying out any cleaning and/or maintenance operations, take the following precautions:
• Ensure that all appliance parts are cold.
• Make sure that the ashes are completely extinguished.
• Use personal protective equipment provided for by Directive 89/391/EEC.
• Ensure that the main power switch is switched off (if present).
• Make sure that the power supply cannot be accidentally reactivated. Disconnect the plug from the
wall socket (if present).
• Always use appropriate equipment for maintenance.
• Once maintenance or repair operations have been completed, before putting the appliance back
into service, reinstall all the safety guards and reactivate all the safety devices.
9.1

Routine maintenance cleaning schedule

9.1.1 Routine cleaning (User)
Grate (Fig. 22)
Ash drawer / compartment (Fig. 22)
Glass (Fig. 24)
9.1.2 Ordinary maintenance (certified technical service centre)
Gaskets (door, refractory cements, etc...)
Flue manifold
Flue system (refer to section "9.3.2 Maintenance of the smoke
system" on page 51)
Appliance (refer to section "9.3.3 Appliance maintenance" on
page 51)
(*) At least once a year or every 4000 kg of fuel burned.
004779040 - 21/03/2022
ITALIANO
ENGLISH
EVERY TIME THE
APPLIANCE IS
DEUTSCH
EVERY WEEK
TURNED ON
X
X
X
FRANÇAIS
ESPAÑOL
1 MONTH
1 YEAR (*)
X
X
X
X
49